Resource Status
| 0.7% COG | CATEGORY | Tonnes (Millions) | % Ni | % Co | Ni Metal (tonnes) |
Co Metal (tonnes) |
% |
|---|---|---|---|---|---|---|---|
| TOTAL | Measured | 45.86 | 0.96 | 0.06 | 441,692 | 28,229 | 42% |
| Indicated | 32.28 | 0.92 | 0.06 | 295,631 | 18,502 | 30% | |
| Inferred | 30.32 | 0.89 | 0.06 | 270,250 | 19,600 | 28% | |
| Combined | 108.46 | 0.93 | 0.06 | 1,007,573 | 66,331 | 100% |
| 0.8% COG | CATEGORY | Tonnes (Millions) | % Ni | % Co | Ni Metal (tonnes) |
Co Metal (tonnes) |
% |
|---|---|---|---|---|---|---|---|
| TOTAL | Measured | 34.22 | 1.04 | 0.07 | 355,198 | 23,037 | 45% |
| Indicated | 22.41 | 0.99 | 0.06 | 222,273 | 14,189 | 30% | |
| Inferred | 19.09 | 0.96 | 0.06 | 184,038 | 11,303 | 25% | |
| Combined | 75.73 | 1.01 | 0.06 | 761,509 | 48,529 | 100% |
| 1.0% COG | CATEGORY | Tonnes (Millions) | % Ni | % Co | Ni Metal (tonnes) |
Co Metal (tonnes) |
% |
|---|---|---|---|---|---|---|---|
| TOTAL | Measured | 19.21 | 1.19 | 0.08 | 228,996 | 15,215 | 59% |
| Indicated | 8.47 | 1.14 | 0.08 | 96,299 | 6,461 | 26% | |
| Inferred | 5.07 | 1.14 | 0.07 | 57,741 | 3,786 | 15% | |
| Combined | 32.74 | 1.17 | 0.08 | 383,036 | 25,463 | 100% |
Table 3: All NiWest Project Areas - 1% Nickel Cut-off Grades
1.2% COG
CATEGORY
Tonnes (Millions)
% Ni
% Co
Ni Metal
(tonnes)Co Metal
(tonnes)%
TOTAL
Measured
7.43
1.37
0.09
101,534
6,681
68%
Indicated
2.23
1.31
0.09
29,165
1,981
20%
Inferred
1.29
1.28
0.09
16,591
1,106
12%
Combined
10.96
1.34
0.09
147,290
10,067
100%
Table 4: All NiWest Project Areas - 1.2% Nickel Cut-off Grades
JORC compliant resources calculated by independent consultants. The block model was developed using MineSight software, the block size used was 20 x 20 x 2 meters. Grades are estimated into the blocks using ordinary kriging.